ENTEL Wire

The complete record of the US nuclear buildout.

Every projectBuying opportunityBusiness relationship

Procurement

Four solicitations at Columbia Generating Station are open on Energy Northwest's own portal, and the first closes 21 October.

Source
Energy Northwest portal, 17 October 2026
Next deadline
21 October 2026

Why it matters

A feed water heater level control upgrade closes 21 October 2026, and none of the four appears in ENTEL's mirror of SAM.gov. A public power agency buying for its own plant has no federal posting duty.

Energy Northwest, which operates Columbia Generating Station, is carrying four solicitations with live deadlines on its supplier portal: a feed water heater level control upgrade closing 21 October, wastewater pond liners and leak detection replacement closing 5 November, a feed water heater replacement closing 11 November, and 4.16 kilovolt cable testing services closing 16 November.

The two feed water heater items are different buys and they are easy to collapse into one. 718041 is a level control upgrade closing 21 October. 716712 is a replacement closing 11 November.

A public power agency buying for its own plant has no obligation to post federally, and Energy Northwest does not. The work exists, the deadlines are real, and anyone watching only the federal feeds never sees it.

This is the specific case behind the figure in The Record. Across four operator and prime-contractor portals read between 25 August and 17 October 2026, almost nothing had a counterpart on SAM.gov, Grants.gov or FPDS.

What to watch

21 October, 5 November, 11 November and 16 November 2026. The portal is the only place they appear.

The documents

This item was read off the documents above. ENTEL does not run an item it cannot source.